4 thoughts on “How to run the floor lacquer business, I do the construction of the floor painting”

  1. Can. 1. The construction temperature is ≥5 ℃. If it is necessary to be constructed at u003C5 ℃, a special formula is selected. Humidity is recommended to be under construction below 75%. 2. Ensure air circulation during construction. When the amount of modulation is used, it cannot exceed 30 minutes. 3. Do a good job in the construction process to avoid dust and debris invasion, affecting the effect of the paint surface. 4. After the construction is completed, it is necessary to be maintained for at least 7 days before they can be put into use. During the maintenance period, it is particularly infiltrated with water or various solutions. 5. It is strictly forbidden to mix other paint. 6. The curing agent must be added strictly in accordance with the prescribed proportion. 7. Keep the coating surface clean, and the water content of the coating must be less than 7%. 8. Keep the coating environment clean, and it is strictly forbidden to build a large amount of dust.

  2. 1. You can cooperate with floor lacquered materials manufacturers. Generally, the construction personnel who buy materials will be required;
    2, you can cooperate with transportation facility companies, and generally do floor paint for parking lots;
    3, multi -plus group communication, There are many ways, and there are more opportunities.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Scroll to Top