Why do the construction units hate supervision and look down on supervision? Do you have to be supervised by a project?

If you do n’t pick up your supervision, what if Party B is holding Party A’s money, what should I do if I cut corners? If the project is canceled in the project, is it necessary to consider whether the country should also cancel disciplinary inspections and disciplinary inspection supervision in the future.

5 thoughts on “Why do the construction units hate supervision and look down on supervision? Do you have to be supervised by a project?”

  1. Question 1. Why does the construction unit hate supervision?
    : In a engineering project, the owner of the construction party has a huge investment in funds and a large amount of capital pressure, so he will try his best to cut corners. And in each acceptance section, the supervision of the supervision will be found in the acceptance, and the construction unit will be required to be rectified, which will make the construction unit take time and effort. It is a bit similar to the relationship between urban management and merchants. Merchants want to put stalls on their own stores on the road. The wider, the better, and the urban management will be supervised and stopped due to their duties, and the merchants will hate urban management.
    . Why does the construction unit look down on supervision?
    : Because the market is chaotic now, the country’s market competition mechanism has adopted a market competition mechanism. There is no restriction of minimum supervision costs, which leads to vicious competition. The supervision fee is too low, and the state’s equipment for supervisors is not very strict. These two points lead to the good and bad of the supervisors arranged by the supervisory company on a project. Essence The wages of these supervision practitioners are often very low, lower than the construction workers. Some poor quality supervisors eat a card for the construction unit, and a mouse shit disrupts a pot of soup. Therefore, the construction party will look down on supervision.
    The question 3. Do a project must be supervised? Can it be replaced in other ways?
    : Construction engineering involves the daily life of everyone around us. We must enter and exit from the building every day. If the project has hidden dangers, it is very dangerous. Once the safety accidents occur, the consequences of the safety accident are unimaginable. And once the construction project is completed, it is very difficult to rectify and restore. The cost is high. Many problems with problems are built and rebuilt. Therefore, it is very important to supervise during the construction process. Coupled with national laws and regulations such as the “Construction Law”, “Regulations on the Management of Construction Engineering”, “Regulations on the Management of Construction Engineering Safety Production”, and the Supervision Regulations, there are clearly stipulating which projects must be implemented. Therefore, supervision must be implemented whether it is actual or in accordance with the requirements of the law.
    Is whether it can be replaced in other ways, my country is currently exploring and trying. For example, Xiong’an New District pilot the construction insurance system to replace the supervision system. In addition, the state issued a full process of consulting services to the state in the previous year to replace the current supervision system, but they are still piloting and cross the river with stones. The supervision system is unique to China. At present, there are many disadvantages. The possibility of changing into other ways after the next five years is very high. No matter how it changes, if we are now a supervisory practitioner, we have no ability to change the country’s policy, and we cannot change the construction employment environment. All we can do is to change the industry, one is to change the industry, do not do supervision, do something else, do something else Profession. The second is to strive to improve your professional technology and management capabilities and meet the requirements of work, so that no matter how the building environment becomes standing.

  2. In engineering construction, the relationship between the construction unit and the supervisory unit is very subtle. On the one hand, the two need to be highly unified collaborative cooperation to ensure the smooth progress of the project construction. On the other hand, the duties of “regulators and supervisors” can be ensured Positioning, we must maintain a certain “alienation”, and use “love each other to kill each other” to describe it at all. So how to deal with the relationship between the two parties is very testing the wisdom of the supervisor! Pay attention to the construction information of the public account, free courseware
    . The construction unit of the cow must be calm, do not intensify the contradiction, grasp the large and small, and win the victory
    Yes, we are too lazy to fight for them, and we have no problem with the project. We are more worrying. For those who always have problems and not in control, we must remember not to pick their small problems. Grasp the problem to seize the crucial issue. Seeing the blood in one shot, it is useless to find Party A to talk about it. I will be convinced. When I first started the supervision, I met a very good × unit. At that time, the construction unit was not convinced to me, and I didn’t even provide me with a desk. All the upper and lower iron joints on the board stay at the beam branch. We must know that it is definitely not allowed to do this. I immediately issued a rectification notice. The construction unit was stupid. I dare not say so. I said who dare not say who signed me, so that the construction unit was more polite to me, and the future work was very smooth. Therefore, the construction unit of the cow must be calm. Policy!
    . The supervisor must have real materials and can make rational suggestions on the construction unit
    The construction unit for the supervisor’s party to pay cattle, we must improve our own business quality, relying on our solid foundation foundation Actively help them analyze the reasons, solve the problem, and put forward pre -control suggestions for the quality problems. Intersection
    . It is strictly forbidden to open the river to expand the small problem. We must learn to calm down the incident
    . Some supervision will report Party A in a timely manner. When it is resolved, it will intensify the contradiction between the construction unit, and Party A will look down on you. Therefore, it is strictly forbidden to expand the problem.
    . The supervision examples must be well opened
    The supervision example meeting is a regular meeting of the supervisor organization. Generally, the number of participants is relatively large. The supervision must be done before the example meeting. The problem is that Party A will get angry with you, and the construction unit is uncomfortable after hearing it. No one can look at you in the long run. The supervision example can fully reflect the quality of a supervisor. What we say must be willing, the problems raised at the meeting must be convinced and enhanced our speaking efforts. In the regular meeting, we will give more advance suggestions according to the progress!
    . Putting up your own position, do not play big names with the construction unit
    The construction unit can receive the project, the energy is very large, and the supervisor cannot offend them. Therefore , Speaking, mastering your own level, the same question is different from the same question, so if you meet a beef construction unit, the attitude of our supervisor’s speech should be gentle, don’t intensify contradictions!
    6. Clean it under your own hand
    S saying that “eating people’s mouth is short, take people’s hands soft”, once you eat and take people, you can speak, you will be gone. The construction unit, the construction unit will sue you black, so as long as you are short in the hands of the construction unit, you will become a slave to the construction unit. Things, remember that Mo greedy!
    of course, the specific situation of each project is different, which requires the supervisor to solve the analysis, seeking truth from facts, and flexible application.

  3. 1. Improve the salary of supervision staff; 2. Strengthen the requirements of institutional norms, and truly lock the rights of supervision in the cage of the system; 3. Change the method of the supervision staff. Our supervisors should experience in the construction unit to fully understand the construction process and construction process. In this way, the supervisors have experience to better supervise the supervision; 4. Improve ideological understanding. For those who taught these crooked winds to students to resist, they should establish the correct engineering outlook and values ​​of the students.
    The exploration of my country’s exploration of the supervision industry is far away. At this stage, the supervision system implemented at this stage is malformed, which is not conducive to the healthy development of my country’s civil engineering industry. If the reform is not carried out, then the supervision unit will become the bodhisattva in the temple. It is just a furnishings. When there is a need, worship it, and the quality of the project is still not guaranteed. We still can’t get assured projects.
    The supervisors also said that in order to pursue the maximum profit of the construction unit and collude with the owner’s unit, they can do everything possible to cut corners. If the construction unit is completely designed and standardized, there is no problem. Chaos.

  4. Without supervision, this project is built illegally.
    Is that Party B is really annoying when the supervision is ugly, but there is no way. Because most Party B still wants to cut corners.

  5. The construction unit now hates the supervision because he is afraid of the supervision to find out his problems, and he is afraid that he will make him reorganize again. There are a lot of construction units to cut corners. The project must be supervised, and there are a lot of accidents that happened in this way. It may be that the supervision is not good.